In August 2010 Pioneer invested in Peak Gen Power to build, own and operate distributed and flexible power plants in the UK. Between August 2010 and March 2016 Peak Gen grew from zero to 300 MW of plants contracted or operational, with plans to grow to 500 MW. In March 2016 Pioneer sold its interest in Peak Gen back to the family office that financed the investment.